Plain concrete is typically a dull grey and useful as a floor material thanks to its hardness and durability rather than its appearance.
Concrete primer for vinyl tile.
The thinset that was applied to glue down the tiles has been applied over a dirty surface and instead of adhering to the substrate it adhered to the dust and oils sitting on top of it.
Let the primer dry and then apply the membrane photos 3 and 4.
Cover the concrete with 1 4 inch plywood and secure it with 1 1 4 inch underlayment nails.
But if the floor is made of newly installed wood ie.
Most peel and stick tile manufacturers will void the warranty on floors laid over unprimed concrete subfloors.
Concrete 1 engineered hardwood 1 prep protection 6 solid hardwood 1 stone 1 tile 7 vct 1 vinyl 3.
Get free shipping on qualified floor primers or buy online pick up in store today in the flooring department.
Cut the membrane so it s 1 1 2 times the width of your tiles.
Priming the floor with a concrete primer before installing the tiles ensures that the moisture naturally present in concrete doesn t come through to the surface affecting the adhesive bond and damaging the tiles.
The ideal method for installing peel and stick vinyl tiles over concrete is to first lay plywood over the concrete.
Then prime the concrete see photo 2 with the recommended solution consult the membrane manufacturer s literature.
In a bucket or mixing bin combine the contents of.
Any tile installation can fail from a lack of using a tile adhesive primer.
Self stick vinyl tile also called peel and stick tile is a do it yourselfer s dream material.
Bond enhancer self stick tile primer model 12056 12 98 12 98.
Similar to linoleum a vinyl tile floor resists stains and spills is a snap to mop and maintain and is durable enough for busy kitchens and playrooms.
Skip this step and we guarantee your new tile will crack right over the cracks in the concrete.
Henry 336 1 gal.
How to seal a concrete floor before applying vinyl tile.
Plywood or a porous concrete then i would definitely recommend the use of the henry 336.
If the existing floor is in good excellent condition then the glue probably does not need any help.
Concrete leveling when the primer has dried it s time to apply the concrete leveler to do so of course you must first prepare the compound.
Once traffic starts walking over it those stresses start moving the tiles and eventually they pop off the floor and get loose.
The tiles will adhere more readily to plywood than to concrete.
It requires only basic skills minimal time and a few tools.